Harris Homestead

Tuesday, May 16, 2006

Index

Calendar

May 1
May 5
May 12
May 16
May 17
May 18
May 20
May 22
May 24
May 27
May 30
May 31

Jun 3
Jun 7
Jun 9
Jun 12
Jun 14
Jun 17
Jun 19
Jun 21
Jun 23
Jun 27
Jun 30

Jul 1
Jul 5
Jul 8
Jul 10
Jul 12
Jul 15
Jul 17
Jul 18
Jul 20
Jul 25
Jul 27

Aug 1
Aug 2

Skating (Dec)

Dec 10 (bird feeding)

Dec 31 snow

 

Backhoe on-site to dig trenches, grade the crawl space, remove stumps, and haul backfill
This is the first trench for a water line to run from the well (to be drilled in July)
 
Completion of "water" trench showing hosing that will be used to pass through the water line
(trench is 9 feet deep)
 
Trench (now filled) showing two pipes for future Geothermal lines
 
Grading of crawl space
Center will be about 5 feet deep with 3 teleposts and sump pit
 
Grading of crawl space