| Interior painting has begun. |
 |
| |
| Floor decking is being screwed to joists (preparation
for finished flooring). |
 |
| |
| Septic tank installed today - about to start trench and
hole. |
 |
| |
| Robert standing in front of 750 gallon tank. |
 |
| |
| Tank being lowered into ground. |
 |
| |
| Other equipment from Gary's Backhoe Service. |
 |
| |
| Final preparation before filling. |
 |
| |
| Grading of soil next to house and over tank. |
 |
| |
| |