Interior painting has begun. |
|
|
Floor decking is being screwed to joists (preparation
for finished flooring). |
|
|
Septic tank installed today - about to start trench and
hole. |
|
|
Robert standing in front of 750 gallon tank. |
|
|
Tank being lowered into ground. |
|
|
Other equipment from Gary's Backhoe Service. |
|
|
Final preparation before filling. |
|
|
Grading of soil next to house and over tank. |
|
|
|