Index
Calendar
May 1
May 5
May 12
May 16
May 17
May 18
May 20
May 22
May 24
May 27
May 30
May 31
Jun 3
Jun 7
Jun 9
Jun 12
Jun 14
Jun 17
Jun 19
Jun 21
Jun 23
Jun 27
Jun 30
Jul 1
Jul 5
Jul 8
Jul 10
Jul 12
Jul 15
Jul 17
Jul 18
Jul 20
Jul 25
Jul 27
Aug 1
Aug 2
Skating (Dec)
Dec 10 (bird feeding)
Dec 31 snow
|
Siding has started (on Friday).
Most of plumbing, electrical, and duct work is done.
Front (West side) of house.
Siding has begun! |
 |
|
South side. |
 |
|
Back (East side). |
 |
|
North side.
Electrical meter panel installed at left side. |
 |
|
The stairs to the second floor are in!
Front door to the left. |
 |
|
Lots of plumbing supplies on the ground.
All supplies have been lying on the ground (these are just outside the
back door). Nothing has gone missing. |
 |
|
Electrical panel with lots of wiring leading to
different parts of the house. |
 |
|
Wiring run through wall between Master bedroom and
Robert's bedroom. |
 |
|
|
|
|