Siding has started (on Friday).
Most of plumbing, electrical, and duct work is done.
Front (West side) of house.
Siding has begun! |
|
|
South side. |
|
|
Back (East side). |
|
|
North side.
Electrical meter panel installed at left side. |
|
|
The stairs to the second floor are in!
Front door to the left. |
|
|
Lots of plumbing supplies on the ground.
All supplies have been lying on the ground (these are just outside the
back door). Nothing has gone missing. |
|
|
Electrical panel with lots of wiring leading to
different parts of the house. |
|
|
Wiring run through wall between Master bedroom and
Robert's bedroom. |
|
|
|
|
|