Front of house (East side).
Siding is done on second floor dormers; framework for front verandah is
in place. |
|
|
Front verandah. |
|
|
North side.
Truck is full of 'used' gyproc (see another picture below). |
|
|
Drywalling...
Drywalling was to start today and be done tomorrow (2 days).
When we arrived at 8pm, there were three people still working on the
drywalling and it was virtually complete! Boy, did they know their job.
This is a view of the living room (standing in the kitchen). |
|
|
View of living room, from kitchen, looking towards front
door, closets, and stairwell (which was about to be drywalled). |
|
|
View looking towards kitchen and back door. |
|
|
Office - looking towards front/side windows. |
|
|
Office - looking towards door (with kitchen and back
door in background) and storage area under stairwell. |
|
|
View from kitchen looking towards office and
furnace/electrical room. |
|
|
Master bedroom. |
|
|
Master bedroom - looking towards closet. |
|
|
Rebecca's room.
Looking into room. |
|
|
Rebecca's room.
Looking out towards hall/bathroom in background. This wall (next to the
stairwell) was not done as they were a couple of sheets of drywall
short. |
|
|
Robert's room (view from doorway). |
|
|
Robert's room (view from end of hall looking into the
room).
Washroom is at left; stairwell and master bedroom at right. |
|
|
View of stairwell from second floor washroom. |
|
|
View of stairwell from living room.
Boy, could they measure, cut, move, and attach the drywall fast -
unbelievable.
(Front door and verandah framing at left). |
|
|
Electrical/furnace room. |
|
|
Finishing up the stairwell.
Three workers and three inspectors taking a sneak peek! |
|
|
Left over drywall was being tossed from Robert's window
on the second floor into this truck.
Name of truck is "David Bullman" (our general contractor). |
|
|
View from Robert's room of excess drywall. |
|
|
Hydro meter.
There is no longer an electrical cable running from the neighbour's
house - we are "independent". |
|
|
|
|