View of front (East side of house).
Singles on front roof; some windows in place. Shingler at very top
(working at back side)! |
|
|
View of rear (West of house). |
|
|
|
|
|
View from north side.
Shingles being raised to scaffolding |
|
|
Window being raised to second floor dormer for
installation.
Entire process took less than 5 minutes |
|
|
Windows arrived yesterday - being stored in kitchen
area. |
|
|
Second floor interior studs in place.
View from master bedroom. |
|
|
Second floor studs.
View from laundry room. |
|
|
Springfield Woodworking.
Hutterite colony that is making the kitchen and bathroom cabinets. View from
road. |
|
|
View of showroom. They use golf carts to drive between
different buildings. |
|
|
Springfield Woodworking showroom.
Pauly is the 'head' of the shop. |
|
Click to see July 5 visit to
their shop. |